Support
Spare Parts & Components
Components for every line type we supply, matched by drawing, sample or model number, with replacement intervals and installation guidance attached.
- All line types
- Built to OEM standard
- Drawing, sample or model number
- Replacement intervals included

Parts as part of the line
A single worn component can stop a line for days. Ordering from the original equipment maker can mean a long lead time, while a part made without the original specification often fails early or damages the equipment around it.
Our spare parts service works from the same technical basis as the line scope: the drawing, the material, the heat treatment and the duty the part actually sees. That is what makes a replacement behave like the part it replaces.
Technical matching
Specification and material recommended against the line model and operating conditions.
Long-term supply
Support continues for lines that are no longer covered by their original maker.
Built to standard
Critical parts made to the original drawing, with material and hardness recorded.
Guidance attached
Installation advice and replacement intervals supplied with the part, not just the part.
Lines covered
| Line type | Main parts demand |
|---|---|
| Pickling line | Squeegee rolls, acid circulation pumps, heat exchanger plates and gaskets, nozzles, scale breaker rolls |
| Reversing mill | Work and backup rolls, mill bearings, universal spindles, emulsion nozzles, hydraulic seals, filter elements |
| Galvanizing line | Air knife blades, sink rolls, stabilizer rolls, pot thermocouples, squeegee rolls, edge position sensors |
| Color coating line | Coating, pick-up and backing rolls, oven fan impellers, disc shear blades, laminator rolls |
| Cut-to-length line | Leveler rolls, shear blades, measuring rolls and encoders, conveyor belts, air-float impellers |
| Slitting line | Circular slitter blades, precision spacers, slitter arbors, separator discs, pressure rolls, trim guide wheels |
Galvanizing and coating line parts
These are the highest-demand categories, because the pot, the air knife and the coaters sit in the most aggressive part of the process.
Galvanizing line
| Part | Specification | Application | Typical interval |
|---|---|---|---|
| Air knife blades | Specialty alloy or ceramic coating, ground in matched pairs to the air knife model | Air knife system | 6 - 12 months |
| Sink roll | Alloy resistant to molten zinc, shaft 120 - 200 mm, with bearing housing | Zinc pot | 12 - 24 months |
| Stabilizer roll | Same alloy family, surface hardness from HRC 45 | Zinc pot | 12 - 24 months |
| Squeegee rolls | Acid or heat-resistant rubber, hardness Shore A 70 - 90 | Cleaning and cooling | 6 - 12 months |
| Thermocouples | K or S type, 310S or Inconel protection tube | Furnace and zinc pot | 6 - 12 months |
| Pot heaters and radiant tubes | U or W type, 310S or 2520 material | Pot heating | 12 - 24 months |
| Edge position sensors | Optical or capacitive, with controller | Entry and exit looper | 24 - 36 months |
| Brush rolls | Stainless body with nylon or stainless filament | Cleaning brush section | 6 - 12 months |
| Air knife fan impellers | Aluminium alloy or stainless, dynamically balanced | Air knife supply | 24 - 36 months |
Color coating line
| Part | Specification | Application | Typical interval |
|---|---|---|---|
| Coating rolls | Chrome-plated steel core or urethane covered, various hardness | Coater | 3 - 6 months |
| Pick-up and transfer rolls | Matched to the coater type | Coater | 3 - 6 months |
| Backing rolls | Solvent-resistant rubber, hardness Shore A 60 - 80 | Coater | 3 - 6 months |
| Oven circulation impellers | Heat-resistant stainless for 380 °C and above | Curing section | 24 - 36 months |
| Disc shear blades | SKD-11 or SKH-51, hardness HRC 58 - 62 | Shearing section | Cutting volume dependent |
| Film laminator rolls | Silicone rubber, moderate hardness | Exit section | 12 - 24 months |
| Paint supply filters | 5 - 20 µm elements | Paint supply | 1 - 3 months |
| Doctor blades and dams | Stainless or engineering plastic | Coater | 6 - 12 months |
Rolling and pickling line parts
Rolls and acid-side components are specified by material and hardness first, because the wrong grade wears quickly regardless of dimensional accuracy.
Reversing mill
| Part | Specification | Application | Typical interval |
|---|---|---|---|
| Work rolls | Forged steel, high-chromium cast iron or HSS, hardness from HS 90, ground to specification | Mill stand | 5,000 - 20,000 t per regrind |
| Backup rolls | Forged or alloy cast steel, hardness from HS 70 | Mill stand | 10,000 - 50,000 t per regrind |
| Mill bearings | Four-row cylindrical or oil-film type, per model | Work and backup rolls | 12 - 24 months |
| Universal spindles | Alloy steel with cross-pins, per drawing | Main drive | Wear dependent |
| Emulsion nozzles | Brass or stainless, 15, 30 or 45 degree spray | Cooling system | 3 - 6 months |
| Hydraulic cylinder seals | Full sets per cylinder model | Screw-down and bending | 12 - 18 months |
| Filter elements | 3 - 5 µm and 10 - 20 µm ratings | Hydraulic and emulsion | 3 - 6 months |
| Tension load cells | Per model, matched to the existing system | Tension measurement | Condition dependent |
| Gauge parts | Ion chamber or X-ray tube matched to the gauge brand | Thickness gauge | 24 - 36 months |
Pickling line
| Part | Specification | Application | Typical interval |
|---|---|---|---|
| Squeegee rolls | Acid-resistant rubber, hardness Shore A 75 - 85 | Rinsing and pickling exit | 6 - 12 months |
| Acid circulation pumps | Engineering plastic or stainless, with mechanical seals | Acid circulation | Wear dependent |
| Heat exchanger plates and gaskets | Titanium or Hastelloy, per model | Acid heating | 24 - 36 months |
| Scale breaker rolls | High-chromium alloy, hardness from HRC 55 | Scale breaking | 12 - 24 months |
| Spray nozzles | 316L or engineering plastic, various angles | Pickling and rinsing | 3 - 6 months |
| Fume scrubber nozzles | Acid-resistant plastic or stainless | Fume treatment | 6 - 12 months |
| Acid concentration sensors | Conductivity or density type with transmitter | Online acid monitoring | 24 - 36 months |
| Brush rolls | Stainless body with nylon or stainless filament | Brush section | 6 - 12 months |
Cut-to-length and slitting line parts
Blades and rolls in the finishing lines set the cut edge and the surface the customer receives, so these parts are ordered to the original tolerance rather than to a nominal size.
| Part | Specification | Application | Typical interval |
|---|---|---|---|
| Leveler rolls | GCr15 or 9Cr2Mo, hardness HRC 58 - 62, complete sets | Precision leveler | 12 - 24 months, multi-regrind |
| Shear blades | SKD-11 or HSS, upper and lower | Shear | By cut count |
| Circular slitter blades | SKD-11 or powder HSS, HRC 58 - 62, matched pairs | Circular slitter | Cutting volume dependent |
| Precision spacers | Tool steel, thickness tolerance ± 0.005 mm | Slitter arbors | Reusable |
| Slitter arbors | 40Cr or 42CrMo, precision ground | Circular slitter | Damage dependent |
| Measuring rolls | With incremental or absolute encoder | Length measurement | 12 - 24 months |
| Conveyor belts | PU or PVC, oil-resistant or anti-static | Conveying section | 6 - 18 months |
| Air-float impellers | Dynamically balanced, wear treated | Air-float stacker | 24 - 36 months |
| Separator discs | Engineering plastic or aluminium alloy | Recoiler entry | 12 - 24 months |
| Pressure rolls | Anti-slip, wear-resistant rubber sleeves | Recoiler | 12 - 18 months |
Electrical and hydraulic parts
Standard components are quoted by model number, with branded or equivalent options stated in the quotation.
| Part | Specification | Application | Options |
|---|---|---|---|
| PLC modules | S7-1200 or S7-1500 series | Line control | Siemens |
| VFD drives | 0.75 - 500 kW, per model | Drive systems | Siemens, ABB |
| Proximity and photoelectric switches | NPN or PNP, per model | Position detection | Omron, SICK, Balluff |
| Encoders | Incremental or absolute | Speed and position | P+F, Kubler, Koyo |
| Pressure sensors | 4 - 20 mA output | Hydraulic systems | WIKA, Honeywell |
| Solenoid and proportional valves | Per model | Hydraulic and pneumatic | Rexroth, Yuken, SMC |
| Hydraulic filters | 3 - 10 µm elements | Hydraulic stations | Parker or equivalent |
| Seals | NBR, FKM or PTFE, per size | Cylinders and units | Parker, Trelleborg or equivalent |
How to order
Two routes cover most requests: manufacture from a drawing or sample, or supply a standard part from the model number. The first fits worn mechanical parts; the second fits electrical, hydraulic and bearing items.
- Nameplate, drawing or a clear photograph with a size reference all work as identification
- Equipment model and parameters are enough for us to check the original configuration
- Old parts can be sent for reverse engineering when no drawing exists
Custom manufacture from drawing or sample
| Step | Action |
|---|---|
| 1 | Send the drawing (PDF or DWG), a physical sample, or dimensioned photographs |
| 2 | Engineers confirm dimensions, material and heat treatment, then quote |
| 3 | Production, typically 15 - 60 days depending on complexity |
| 4 | Inspection against the drawing, with a report issued |
| 5 | Packaging and shipment to the address you nominate |
Order by model number
| Step | Action |
|---|---|
| 1 | Send the part model or a nameplate photograph with brand and specification |
| 2 | We check stock or supplier availability and confirm the quotation |
| 3 | Standard parts usually ship within a few days of confirmation |
Configuration inputs
What we need to specify this line
- 01Line type and equipment model
- 02Drawing, sample or nameplate details
- 03Material and hardness requirement
- 04Quantity and required delivery date
Questions
Questions we hear on this line
How do I identify the part I need?
A nameplate photograph, the OEM drawing, a dimensioned photo of the old part, or the equipment model and parameters are all enough to start. Where no drawing exists, the old part can be sent for reverse engineering.
Can a manufactured part match the original?
Critical parts are made to the original drawing and standard, with material, heat treatment, precision and hardness recorded. The inspection method is agreed before production, not after.
What warranty applies to spare parts?
Warranty is set by part category and stated in the quotation, covering quality-related failures rather than damage from installation or operation. Terms for rolls and air knives are agreed case by case.
Is there a minimum order quantity?
Standard parts can be ordered as single pieces. Custom-made parts usually start at two to four pieces depending on the process and material.
Which brands can you supply?
Mechanical parts are manufactured to the original standard and marked accordingly. Electrical, hydraulic and bearing items come from the named brands or agreed equivalents, and client-specified brands can be quoted on request.
Related terms
What engineers search for on this line
- steel processing spare parts
- galvanizing line parts
- air knife blades
- sink roll
- shear blades
- slitter blades
- leveler rolls
- mill rolls
- industrial spare parts
Other lines
Sections planned in the same scope

Pickling Lines (PPL & CPL)
Turnkey push-pull and continuous pickling lines for hot-rolled strip, covering scale breaking, acid pickling, rinsing, fume treatment and acid regeneration.

Reversing Cold Rolling Mills (CRM & TCRM)
Turnkey single-stand and tandem reversing cold rolling mills for carbon, silicon, stainless and HSLA strip, with hydraulic gauge and automatic flatness control.

Continuous Hot-Dip Galvanizing Line
Turnkey continuous hot-dip galvanizing lines for GI, 55% Al-Zn and Al-Zn-Mg coatings, from cleaning and annealing through the zinc pot, skin-pass and chemical treatment.
Planning a new line or an upgrade?
Send the product mix and target capacity, and we will review the configuration.
