What the line delivers

The line applies protective and decorative coatings to pre-galvanized or cold-rolled strip. The coil passes through cleaning, chemical pre-treatment, primer, curing, topcoat, curing, cooling and optional film lamination, and leaves as prepainted coil.

Coating system, colour and finish are agreed from the end use. Roofing and cladding, appliance panels, interior panels and transport panels each carry different durability and appearance requirements, so the line is configured around that mix.

2C2B and 3C3B

Two or three coating and curing cycles built on the same line platform.

Five coating systems

PE, SMP, HDP, PVDF and FEVE chemistries, with the oven profile matched to each.

Surface options

Smooth, embossed, wood grain, metallic, pearlescent and easy-clean finishes.

Fume treatment in scope

RTO or TO incineration specified with the ovens rather than retrofitted later.

Where prepainted coil goes

MarketProducts
ConstructionMetal roofing, wall cladding, sandwich panels, cleanroom panels, gutters, roller shutters
AppliancesRefrigerator side panels, washing machine tops, microwave housings, air conditioner casings
InteriorCeiling panels, partition boards, wall panels, blinds
TransportationTruck body panels, container side panels, trailer interiors
General industryElectrical cabinets, cable trays, ventilation ducts, storage rack shelves
02

Process sequence

The sequence is fixed; what changes between products is the number of coating and curing cycles and the coating chemistry.

StageOperation
Coil entryDouble-mandrel uncoiler, pinch leveler, hydraulic shear, stitcher or narrow-lap welder
Entry looperAccumulates strip for non-stop coil change
CleaningAlkaline spray with brush scrubbing and counter-flow rinsing
Pre-treatmentPassivation conversion coating applied by two-roll coater, then dried
PrimerReverse-roll primer coating
Primer curingOven 1 with multi-zone temperature control, then cooling
TopcoatReverse-roll topcoat, with optional back coat at the same station
Topcoat curingOven 2 with an independent temperature profile, then cooling
ExitOptional film lamination, exit looper, shear, recoiling and packaging

Configuration options

ConfigurationDescriptionTypical applicationCost level
2-coat/2-bake (2C2B)Primer and topcoat with two curing cyclesStandard construction panelsBaseline
3-coat/3-bake (3C3B)Primer, intermediate coat and topcoat with three curing cyclesHigh-end appliances, automotiveHigher
With back coatBack side coated during topcoat applicationSandwich and composite panelsModerate
With film laminationProtective film applied after topcoat curingAppliance exteriors, high-gloss surfacesModerate
03

Coating systems and finishes

The coating chemistry sets the durability and the market the product can serve. The oven profile, coating thickness and pre-treatment are matched to the system rather than treated as interchangeable.

Coating systemDurabilityTypical applicationsMarket tier
Polyester (PE)5 - 8 yearsGeneral industrial buildings, warehouses, simple structuresEconomy
Silicone-modified polyester (SMP)8 - 12 yearsIndustrial plants, commercial building exteriorsMid-range
High-durability polyester (HDP)12 - 15 yearsPremium buildings, airports, transit stationsMid to high
Polyvinylidene fluoride (PVDF)20+ yearsLandmark buildings, coastal structures, curtain wallsPremium
Fluoroethylene vinyl ether (FEVE)25+ yearsHigh-rise buildings, chemical plant structuresUltra-premium

Service life is indicative and depends on coating thickness, substrate, exposure and maintenance. The system is selected against the environment the panel will face.

Surface finishes

FinishMethodEffect
SmoothStandard roll coatingMatte, semi-gloss or high-gloss
EmbossedEmbossing rollThree-dimensional pattern
Wood grain or leatherEngraved rollRealistic wood or leather appearance
MetallicAluminium pigment additionMetallic sparkle
PearlescentPearl pigment additionIridescent colour shift
Easy-cleanHydrophobic coatingDirt-resistant surface
04

Technical specifications

The range below is the standard offer. Widths, speeds and coating thicknesses outside it are engineered against the product mix.

ParameterRangeNotes
Annual capacity30,000 / 50,000 / 100,000 / 150,000 / 200,000 tStandard tiers; custom available
SubstrateGI / GL / ZAM / cold-rolledPre-galvanized substrate recommended for outdoor use
Strip width600 - 1,250 mm, up to 1,550 mmWider strip needs wider coating rolls
Strip thickness0.15 - 1.2 mm standard, up to 2.0 mmThicker strip needs tension adjustment
Maximum line speed60 / 80 / 100 / 120 / 150 m/minHigher speeds need more oven capacity
Coating systemsPE / SMP / HDP / PVDF / FEVEClient-specified or recommended
Coating thicknessTopcoat 15 - 25 µm; primer 5 - 10 µm per sideAdjusted to the product requirement
Peak metal temperature180 - 240 °CSet by the coating chemistry
Installed powerapprox. 800 - 2,000 kWDepends on capacity and heating method
Approx. footprint1,000 - 3,000 m²Includes raw material and finished goods storage
05

Entry and pre-treatment

Coating adhesion is decided before the paint is applied, so cleaning and passivation are specified as a process rather than as auxiliary equipment.

Entry section

EquipmentFunctionDetail
Double-mandrel uncoilerSupports the coil and unwinds at controlled tensionNon-stop coil change with dual mandrels
Pinch levelerFlattens the strip lead end and feeds the line5-roll or 7-roll configuration
Hydraulic shearCrops irregular coil head and tailHold-down for a clean cut
Stitcher or narrow-lap welderJoins coils end to end for continuous productionWeld strength ≥ 90% of parent metal
Entry looperAccumulates strip for non-stop coil changeStorage capacity ≥ 3 minutes of line operation

Cleaning and pre-treatment

EquipmentFunctionDetail
Alkaline spray cleaningRemoves oil, dirt and contaminantsMulti-stage spray with brushes
Brush scrubbingMechanical removal of stubborn residueNylon or stainless brush rolls
RinsingRemoves residual alkaline solutionCounter-flow, 3 - 5 stages
PassivationForms the conversion coating for paint adhesionTwo-roll coater application
Hot-air dryerDries the strip before coatingUniform temperature across the width
06

Coating and curing

The coaters and the ovens are specified together. Coating thickness control, booth ventilation and oven zoning all affect the same result, so they are reviewed as one system.

Coating section

EquipmentFunctionDetail
Primer coaterApplies primer by reverse roll3-roll or 4-roll, thickness within ± 0.5 µm
Topcoat coaterApplies topcoat and optional back coatIndependent servo control for each roll
Coating thickness controlClosed-loop adjustment of roll speed and pressureOnline gauge feedback optional
Enclosed boothContains solvent vapour and protects the workplaceNegative pressure, solvent-resistant materials
Colour change systemShortens the transition between coloursAutomatic wash cycle, changeover under 30 minutes
Paint supplyDelivers paint at consistent viscosityTemperature-controlled, filtered circulation

Curing section

EquipmentFunctionDetail
Primer ovenCures the primerBridge or catenary design with multi-zone control
Topcoat ovenCures the topcoatIndependent temperature profile
Hot-air circulationDistributes heat across the strip widthTemperature uniformity within ± 3 °C
Heating optionsHeat source for the ovensGas, electric or thermal oil
RTO or TO incinerationPurifies solvent-laden exhaustDestruction efficiency ≥ 98%, heat recovery ≥ 85%
07

Cooling, exit and automation

Cooling and recoiling set the surface the customer receives, while the control layer ties the sections together and records what was produced.

Cooling and exit

EquipmentFunctionDetail
Air coolingCools strip from curing temperatureForced-air blowers with adjustable flow
Water quench (optional)Rapid cooling for certain systemsRecirculated water with temperature control
Film laminator (optional)Applies protective filmUniform tension, no bubbles
Exit looperAccumulates strip for non-stop recoilingStorage ≥ 2 minutes
Flying or disc shearCuts strip at target coil weightPrecise cut length
Dual recoilersWinds the finished coilAlternating operation for continuous production
Packaging stationStraps, wraps and labels coilsAutomatic or semi-automatic

Electrical and automation

SystemFunctionDetail
PLC controlLine sequence, speed and tensionPlatform agreed with the plant standard
HMI workstationsOperation, recipe management and diagnosticsTouch screen, multi-language
AC drivesSpeed control per sectionIndependent drive for each section
Coating thickness gaugesOnline coating weight measurementX-ray, infrared or beta backscatter, optional
Colour measurement (optional)Online colour verificationSpectrophotometer with closed-loop feedback
Production reportingData logging and traceabilityMES or ERP integration optional
08

Substrates and finished products

The substrate determines the pre-treatment and the corrosion base. Aluminium and stainless need dedicated lines or dedicated pre-treatment, so they are reviewed before the scope is fixed.

Suitable substrates

SubstrateRepresentative standardsThicknessNotes
Hot-dip galvanized (GI)ASTM A653 / EN 10346 / JIS G33020.15 - 1.2 mmMost common substrate
55% Al-Zn (GL)ASTM A792 / EN 103460.15 - 1.2 mmHigher corrosion resistance
Al-Zn-Mg (ZAM)Proprietary / JIS0.15 - 1.2 mmPremium corrosion performance
Cold-rolled steelASTM A1008 / EN 101300.15 - 1.2 mmNeeds prior galvanizing for outdoor use
AluminiumASTM B209 / EN 4850.2 - 1.5 mmDedicated line or pre-treatment
Stainless steelASTM A240 / EN 100880.2 - 1.0 mmSpecialised pre-treatment

Finished product range

ProductThicknessCoating systemApplication
Construction panel0.3 - 0.8 mmPE / SMP / HDPRoofing and wall cladding
Appliance panel0.3 - 0.8 mmHDP / PVDFRefrigerator, washer
Architectural panel0.4 - 1.0 mmPVDF / FEVECurtain wall, landmark
Sandwich panel face0.3 - 0.6 mmPE / SMPComposite panels
Interior panel0.3 - 0.6 mmPE / SMPCeiling, partition
09

Standard scope of supply

Scope is offered as a full turnkey line or as core equipment with auxiliaries procured locally. The coating and curing sections stay under our supervision either way.

ModuleIncluded equipmentPackage
Entry sectionUncoiler, pinch leveler, shear, welder, entry looperFull line only
Cleaning and pre-treatmentAlkaline spray, brush scrubber, rinsing, passivation coater, dryerAvailable separately
Coating sectionPrimer coater, topcoat coater, optional back coater, paint supply, enclosed boothCore, supervised supply
Curing sectionPrimer oven, topcoat oven, hot-air circulation, RTO or TO systemCore, supervised supply
Cooling and exitAir cooling, optional water quench and film laminator, exit looper, shear, recoilersAvailable separately
Electrical and automationPLC, HMI, AC drives, coating thickness gauges, production reportingFull line only
Auxiliary systemsHydraulic station, compressed air, optional wastewater treatmentAvailable separately
10

Upgrade and support

Existing lines can be upgraded in steps, whether or not we supplied them. Emission, coating system and automation upgrades are the most common requests.

  • Oven temperature, line speed and coating thickness data uploaded in real time
  • Coating roll wear prediction and replacement scheduling
  • Mobile dashboard with alerts and production reporting
RetrofitScopeTypical driver
Capacity upgradeHigher-power motors, upgraded drives, oven expansionDemand growth on an existing line
Coating system upgradeAdditional curing zones, modified booth ventilationMoving from PE to PVDF or FEVE products
Fume treatment retrofitAdd or replace the RTO incineratorTighter emission standards
Automation upgradeCoating thickness closed loop, online colour measurementProduct consistency requirement
Heat recovery retrofitFlue gas heat recovery on the ovensEnergy cost
MES or ERP integrationProduction data interfaceTraceability requirements

Configuration inputs

What we need to specify this line

  1. 01Substrate type and coating system
  2. 02Coating thickness and colour requirements
  3. 03Strip width, thickness and coil weight
  4. 04Target output, energy source and emission limits
Send your requirement

Questions

Questions we hear on this line

2C2B or 3C3B — how is the choice made?

It follows the product. Standard construction panels usually need two coats, while high-end appliance and automotive panels need an intermediate coat and a third curing cycle.

Can one line run PE, HDP and PVDF?

The coating section can serve several chemistries, but the oven profile and peak metal temperature have to suit the system being run. The changeover procedure is agreed at specification stage.

Is fume treatment part of the line?

Yes, RTO or TO incineration is specified with the ovens. It is not treated as a separate environmental package added after the line has been designed.

Related terms

What engineers search for on this line

  • color coating line
  • CCL
  • prepainted steel line
  • color coated steel
  • coil coating line
  • 2C2B
  • 3C3B
  • PVDF coating line
  • RTO fume treatment

Planning a new line or an upgrade?

Send the product mix and target capacity, and we will review the configuration.

Talk to an engineer