Push-pull (PPL) and continuous (CPL) pickling lines for hot-rolled steel strip, planned from scale breaking through to fume treatment.

  • Push-pull (PPL) and continuous (CPL)
  • 300,000 – 1,200,000 t/yr
  • Strip thickness 1.0 – 6.0 mm
  • HCl / H₂SO₄ / mixed acid
Pickling Lines (PPL & CPL) equipment in a steel strip processing plant
01

The first quality gate in steel processing

Pickling is the first process step in cold rolling and in many downstream finishing routes. Hot-rolled strip carries an oxide scale that, if it is left in place, wears cold mill rolls, prints surface defects into the finished product and prevents coating from adhering.

The job of the line is to remove that scale through mechanical and chemical action, and to leave a clean strip surface with controlled roughness — ready for cold rolling, galvanizing, coating, or direct sale as pickled sheet.

  • Roll wear and surface defects carried into the cold mill
  • Coating adhesion problems in galvanizing and painting
  • Rejected strip where scale has been rolled into the surface

Surface cleanliness

Strip leaves the line clean enough for cold rolling or coating without a second cleaning step.

Lower roll wear

Scale-free strip removes the abrasive wear that shortens cold mill roll life.

Controlled acid use

Cascade flow, online concentration control and optional regeneration keep acid consumption within the design figure.

Contained emissions

Sealed tanks, fume scrubbing and waste-acid handling are part of the line scope, not site add-ons.

02

Where pickled strip goes next

The same pickled coil feeds several downstream routes. The surface requirement differs between them, so it is agreed at specification stage rather than assumed from the grade alone.

Downstream processRole of pickled strip
Cold rollingScale-free substrate that protects rolls and avoids rolled-in defects
Hot-dip galvanizingPickled hot-rolled strip as the substrate for coated structural grades
Colour coatingClean surface for paint adhesion
Direct salePickled sheet and coil for automotive structures, machinery, drums, hardware and tube
03

Two platform options: PPL and CPL

Two configurations cover the range: push-pull (PPL) and continuous (CPL). The choice follows capacity target, capital budget and site constraints. We engineer both, and recommend one against your production profile.

Push-pull (PPL)Continuous (CPL)
Operating principleCoils pulled through the tanks in sequence, with a stop for coil changeCoils welded end to end for uninterrupted operation
Annual capacity200,000 – 800,000 t/yr600,000 – 1,200,000+ t/yr
Capital investmentLower — no welder or loopersHigher — welder and entry/exit loopers included
Operating efficiencyCoil-change downtime reduces outputNo coil-change downtime
YieldHigher head and tail cropping lossesLower cropping losses
Surface qualityGood, standard qualityUniform from head to tail
Typical applicationSmall to medium scale, multi-product, short runsLarge scale, single product, high volume
FootprintCompactLarger, with looper pits or towers
04

Stage 1 — mechanical scale breaking

Mechanical pre-treatment cracks the scale before chemical pickling, so the acid has less work to do and the bath lasts longer.

EquipmentFunctionAdvantage
Scale breaker (tensile leveler)Bending and tension create micro-cracks in the oxide layerHydraulic roll gap adjustment follows strip thickness and grade
Shot blasting (optional)Mechanical impact removes scale from thick or high-strength stripReduces acid demand on difficult grades

Pre-treatment raises pickling efficiency and allows a lower acid concentration, which extends bath life.

05

Stage 2 — chemical pickling

Tanks are arranged in a cascade, with acid concentration increasing from entry to exit. Fresh acid enters at the last tank and flows back; spent acid leaves from the first.

ParameterSpecificationEffect
Tanks3 – 6 stages, cascade arrangementProgressive pickling along the line
Acid typeHCl standard; H₂SO₄ or mixed acid on requestHCl for most carbon steels
Temperature65 – 85 °C (HCl) / 80 – 95 °C (H₂SO₄)Set to the reaction kinetics of the grade
Concentration controlOnline conductivity measurement with automatic replenishmentHolds concentration within a narrow band
Turbulent picklingHigh-velocity acid flow through the tanksShortens the time needed at temperature

Tank material is PPH or acid-resistant steel, selected against the acid system and operating temperature.

06

Stage 3 — brushing, rinsing and drying

Residual acid and iron salts have to leave the strip before the exit section, otherwise they show up as staining once the strip is dry.

EquipmentFunctionFeatures
Brush scrubbers (optional)Mechanical removal of residual oxide and saltsNylon or stainless filament, adjustable pressure
Multi-stage rinsingRemoves residual acid and iron saltsCounter-flow design, 3 – 5 stages
Squeegee rollsRemoves surface moistureAcid-resistant rubber
Hot-air dryerDries the strip before the exit sectionAdjustable temperature, no residual moisture
07

Environmental protection

Fume, waste acid and spillage are handled inside the line scope, so the plant can meet its emission and discharge limits without retrofitting afterwards.

SystemTechnologyResult
Tank enclosureSealed covers with negative-pressure extractionAcid mist kept out of the workplace
Fume scrubbingAlkaline spray neutralisation with demisterRemoval efficiency ≥ 98%
Acid regeneration (optional)Spray roasting or ion exchangeAcid recovery ≥ 99%; saleable Fe₂O₃ by-product
Wastewater treatment (optional)Neutralisation, precipitation and biological treatmentDischarge to standard or water reuse
Floor protectionSealed concrete with acid-resistant liningGroundwater protection
08

Technical specifications

The figures below are the standard range. Capacities and speeds outside it are engineered against the product mix rather than offered as a catalogue option.

Push-pull (PPL) — standard range

ParameterRangeNotes
Annual capacity200,000 / 300,000 / 400,000 / 500,000 / 600,000 tCustom capacities available
Strip gradesCarbon, low-alloy, HSLA (≤ 800 MPa); some stainlessSpecialty grades need a custom acid formulation
Strip width600 – 1,250 mm (up to 1,600 mm)Wider strip requires larger equipment
Strip thickness1.0 – 4.0 mm standard; up to 6.0 mm extendedThicker strip needs higher breaker force and longer time
Line speed60 / 80 / 100 / 120 / 150 m/minSet by capacity and substrate
Pickling tanks3 / 4 / 5 / 6 stagesMore stages for heavier scale
Acid temperature65 – 85 °C (HCl)Closed-loop temperature control
Acid consumption8 – 15 kg/t (HCl, substrate-dependent)With cascade control and regeneration
Installed powerapprox. 600 – 1,500 kWDepends on capacity and scope
Footprintapprox. 1,200 – 3,500 m²Excludes acid regeneration plant

Continuous (CPL) — additional specifications

ParameterSpecificationNotes
Annual capacity600,000 – 1,200,000+ tContinuous operation for higher throughput
Looper capacity≥ 2.5 minutes of line operationCovers coil change without stopping the process section
WelderResistance seam or laserWeld strength ≥ 90% of parent metal
Yield≥ 98.5%Reduced head and tail cropping
09

Standard equipment scope

Scope is supplied as one sequence, with the interfaces between modules defined before manufacturing begins.

ModuleIncluded equipmentEngineering detail
Entry sectionUncoiler, pinch leveler, crop shear; welder and entry looper on CPLPrecise expansion control; weld parameters set by grade
Scale breakingScale breaker (5-roll or 6-roll tensile leveler)Servo-hydraulic control for different strength grades
Pickling sectionMulti-stage tanks, heat exchangers, acid circulation pumps, fume hoodsTank material PPH or acid-resistant steel
Rinsing sectionMulti-stage rinse tanks, brush scrubbers, squeegee rollsCounter-flow water design
Drying sectionHot-air dryerStrip dried before the exit section
Exit sectionSide trimmer (optional), recoiler; looper and recoiler on CPLShear accuracy and tight recoils
Electrical and automationPLC, HMI workstations, AC drives, online acid concentration sensorsPlatform agreed with the plant standard
Fume treatmentAlkaline scrubbing tower, exhaust fans, ductworkDesigned to local emission limits
Auxiliary systemsHydraulic unit, compressed air, acid storage, spent acid tanks, heat exchange stationSingle-source supply
10

Materials processed

Pickling difficulty varies with grade and scale condition. The line is set for the grades you actually run, not for a nominal carbon steel.

Suitable strip grades

Grade typeRepresentative standardsNotes
Carbon steelASTM A1011 / EN S235 / JIS SPHCStandard process
Quality carbon steelASTM A1008 / EN S355 / JIS SAPHTime control to avoid over-pickling
HSLA steelASTM A572 / EN S420 / JIS SPA-HDense scale; stronger breaker
Automotive structuralASTM A1008 / EN DC04 / JIS SPPHigh surface requirement
Pipe gradesAPI 5L X42 – X70Thick gauge and high strength; dedicated pickling curve
Stainless (hot-rolled annealed)ASTM 304 / 430HNO₃ + HF mixed acid system

Product forms

ProductSpecificationEnd use
Pickled coil (full width)Coil weight 5 – 30 tCold rolling feedstock or direct sale
Pickled sheet (cut-to-length)Custom lengthsMachinery, stamping, drums
Pickled trimmed coilEdge-trimmedHigh-end cold rolling feedstock
11

Supply and delivery options

Scope can be taken as a complete line or as defined modules, depending on the engineering resource available on site.

Supply modes

ModeScopeBest for
TurnkeyProcess design, equipment, installation supervision, commissioning, training and sparesNew investors and clients with limited technical teams
Core equipment supplyPickling section — tanks, heating, circulation — and electrical controlsClients with local fabrication capability
Upgrade or retrofitDiagnostics, design, key equipment replacement, automation upgradeExisting lines with performance or quality issues
Environmental add-onFume scrubber, acid regeneration, wastewater treatmentFacilities facing tighter emission regulations

Standard project timeline

PhaseDurationKey activities
Engineering and design30 – 40 days after signingMass balance, general layout, foundation drawings, utility requirements
Equipment manufacturing90 – 180 days, capacity-dependentInspector on site, hold-point inspections, quality reports
Factory acceptance test5 – 7 days before shipmentNo-load run and water circulation test
Shipping and logisticsVaries by destinationCustoms support and export documentation
Installation supervision90 – 120 days after arrivalField engineers on site
Commissioning and trial run15 – 25 days after installationCold run, acid circulation, hot trial, performance check
Operator trainingDuring commissioningClassroom, hands-on and SOP manuals
Site acceptanceOn performance validationCertificate signed; warranty 12 – 18 months
12

Support after handover

Spare parts, retrofit work and diagnostics continue after the warranty period. Common requests are listed below.

  • Remote data acquisition for temperature, concentration, speed and tension
  • Mobile dashboard with alerts for out-of-band conditions
  • Remote engineering diagnostics and parameter optimisation
  • Annual performance report with maintenance recommendations

Typical spare parts

PartApplicationMaterial
Scale breaker rollsScale breaking sectionHigh-chromium alloy, wear-resistant
Pickling tank linersPickling sectionPPH or acid-resistant rubber
Squeegee rollsRinsing and pickling exitAcid-resistant rubber, several hardness grades
Brush rollsBrush sectionNylon or stainless filament, replaceable
Acid circulation pumpsPickling sectionChemical-duty, corrosion resistant
Heat exchanger plates and gasketsAcid heating systemTitanium or Hastelloy options
Fume scrubber nozzlesFume treatmentAcid-corrosion resistant
Circular shear bladesExit trimmingSKD-11

Retrofit options

RetrofitScopeTypical driver
Automatic acid concentration controlConductivity and density meters with automatic replenishmentHigh acid consumption or inconsistent quality
Fume scrubber upgradeHigh-efficiency tower with demisterEmission limits
Acid regeneration systemSpray roasting or ion exchangeSpent acid disposal cost and environmental pressure
Scale breaker upgradeAdd or upgrade the tensile levelerGrowing share of HSLA grades
Automation upgradePLC and HMI renewal with remote monitoringAgeing controls and downtime
Capacity debottleneckingMotors, drives and speed increaseDemand growth on a space-constrained site

Configuration inputs

What we need to specify this line

  1. 01Steel grades and the scale condition you run
  2. 02Strip width, thickness range and coil weight
  3. 03Target output and the PPL or CPL choice
  4. 04Acid system, emission limits and site utilities
Send your requirement

Questions

Questions we hear on this line

PPL or CPL — how is the choice made?

Capacity target is the first filter. PPL suits multi-product, short-run output with a lower capital outlay; CPL suits high-volume, single-product output where coil-change downtime is not acceptable.

Can an existing pickling line be rebuilt in stages?

In many cases yes. Tanks, rinsing, scale breaking and entry or exit equipment can be replaced separately once the interfaces, foundations and line control have been verified first.

Is acid regeneration part of the line?

It is an optional module. Spray roasting and ion exchange are both offered, selected against the acid system, capacity and the cost of spent acid disposal on site.

Related terms

What engineers search for on this line

  • pickling line
  • push-pull pickling line
  • continuous pickling line
  • PPL
  • CPL
  • steel strip pickling
  • hot-rolled pickling
  • acid pickling equipment
  • acid regeneration system